How to Create and Mark Common Structure
Tutorial Video
Steps
-
Drafting:
- Podium
- If there are any Common Podium Plans within a building, move those floor plans outside the
__BN_BuildingPlan
polyline. - Create Podium polyline including all the Common Podium Floor Plans within it.
- If there are any Common Podium Plans within a building, move those floor plans outside the
- Common Basement
- If there are any Common Basement floor plans within a building, move those floor plans outside the
__BN_BuildingPlan
polyline. - Create a Common Basement polyline including all the Common Basement Floor Plans within it.
- If there are any Common Basement floor plans within a building, move those floor plans outside the
- Common Structure
- Create a Common Structure polyline including both the Podium and Common Basement polylines.
- Podium
-
Marking:
- Mark Common Structure:
- Common Structure Name:
- Navigate to Guided Marking => Common Structure => Common Structure
- Provide a name for the created common structure
- Proposed Work Map:
- Navigate to Common Structure => Proposed Work Map
- Select the proposed work WRT which the direction ref circles are drawn inside the floor plans of the common structure.
- Highest Level Podium.
- Navigate to Common Structure => Podium Segments
- Select the highest level podium floor plan in Common Structure.
- Mark the margins for the podium area outline which is selected.
- Common Structure Name:
- Mark Building:
- Building to Common Structure Map:
- Navigate to Building => Common Structure Map
- Select the common structure that is applicable for this building.
- If an applicable common structure is selected for the building, the floor plans within the common structure will also be available to map the floor in sections within this building.
- Building to Common Structure Map:
- Mark Common Structure:
Locations
- Ensure that
__BN_CommonBasement
and__BN_Podium
layers are present inside the__BN_CommonStructure
Layer.
CheckPoints
- Ensure that Building is mapped to Common Structure (If Applicable) before starting the Floor Plan Mapping step.